Richmond luxury homesAfter months of anticipation, Boone Homes is excited to announce that construction is scheduled to begin this week on five Richmond luxury homes at Ellington at Wyndham. Two of the spacious homes will be model homes and three are spec homes.

The first five homes include:

  • Home Site 7 – Highwick Home Design (Spec)
  • Home Site 11 – Creeksted Home Design (Spec)
  • Home Site 12 – Waterhaven Home Design (Spec)
  • Home Site 13 – Gateworth Home Design (Model)
  • Home Site 14 – Brookstone Home Design (Model)

In addition to these five homes, presales are currently available on two homes with construction expected to begin in mid-May with an expected closing date of late November. Both of these homes will feature basements.

Ellington is the first Richmond neighborhood to be built in the established Wyndham community in over a decade and features stunning homes priced from the $525,000s. In celebration of the new community, Boone Homes introduced nine brand new home designs that showcase three to five bedrooms and 2.5 to 4.5 bathrooms. Spacious interiors highlight upscale finishes and are perfect for entertaining with gourmet kitchens, airy family rooms and formal dining rooms. Luxurious owner’s suite provide the ideal area for unwinding after a long day with bathrooms that include soaking tubs and separate ceramic tile showers. Additionally, every home is built to meet ENERGY STAR standards that help reduce monthly heating and cooling bills.

At Ellington, buyers get more than a beautiful new home; they get a fantastic new lifestyle. A master-planned community, Wyndham provides ample opportunities for homeowners to socialize with neighbors. The unparalleled amenity package includes a swimming pool, tot lots, tennis courts, soccer field, basketball courts, gazebo and amphitheater situated among the serene backdrop of Otter Pond and Wyndham Lake. Residents also have the opportunity to join the Dominion Club. Located in the heart of the community, the Dominion Club features a tennis center, fitness room, pool, 18-hole golf course, driving range and 28,000 square foot clubhouse with a casual Wyndham Grill, meeting rooms and private dining rooms.

Exciting things are going on at Ellington at Wyndham and NOW is the time to learn more about this amazing community. For more information or to register for the community VIP List, call 804-708-5127 or visit