Building your own home is a dream most of us aspire to. You can choose exactly what it will look like, from the floor plan to the finishes. Every detail can be perfectly suited to you and your needs.

But you may be wondering, “How much time does it take to build a house?” The answer can depend on a number of factors, including the type of home builder, the building site, the weather, and your location. Read on to learn more about how long you can expect to wait before moving into your dream home.

Location and Environment

The biggest thing that impacts the build time for your home is your location and environmental factors. You might be surprised to learn that homes in mountainous regions take the least time to build, followed by metropolitan areas. Rural areas take longer, since you may have to have materials shipped in, and the Mid-Atlantic region has the longest average times.

The environmental conditions such as your soil type and site topography will be the other major influence on your home timeline. Building sites that need a lot of leveling and draining work will take a lot longer than a site that’s already flat and has stable draining soil conditions. If your area is susceptible to earthquakes, mudslides, or wildfires, the project could take longer to complete.

Things That Slow Down Building 

Other than the environmental factors, there are some issues that can delay construction on your house. The biggest of these factors is rain and snow. Concrete needs to cure and framing needs to happen when it’s dry outside, so if you build your home during a rainy year, there will be a lot of non-productive days.

The other big delay is something you can manage: owner delays. If you can’t decide what flooring you want or you decide last-minute that you want the laundry room in the bedroom closet, not in the mudroom, that can cause huge delays. As much as possible, try to make every decision about your home before you ever break first ground.

How Much Time Does It Take to Build a House?

No matter where you live, you can expect your home to be completed in under a year. On average, the construction time should take between six  months. If things go very smoothly, you could be in the house as soon as three months later, or if there are a lot of delays, you could be looking at more than nine months. 

How Long Will It Take to Build Your Dream Home?

There are a number of factors that can impact how long it takes to build a house. When working with Boone Homes, you can expect to have your home completed within 6-7 months. When working with a custom builder, like Boone Homes, the biggest thing you can do to speed the process along is to make sure you have a rock-solid plan for what you want with the house. You can’t control things like the weather, but you can control how much work your builders have to undo because you changed your mind.